Our Facilities



Our Operating Projects
• Anemon WPP (30.4 MW) (*) Generation : 92,420,000 kWhour / year
Anemon Energy / Anemon WPP, which was founded with Demirer Energy as 50%-50% partnership, will generate 92,420,000 kWh/year with an installed capacity of 30.4 MW. All of the turbines were commissioned as of July 2007 and started to supply electricity to the system. There are 38 Enercon 800kW wind turbines. It is one of the world's top 3 'Gold Standard' certified voluntary carbon projects. This electricity, generated without CO2 emission of 67,000 ton, supplies the electricity for approximately 38,000 houses.

• Tocak-1 HEPP (4.76 MW)
• Alakır HEPP (2.06 MW)
• Kozdere HEPP (9.265 MW)

Our Projects that are Under Construction
• Çayağzı HEPP (9.76 MW)

Our Projects that are in the Project Development Stage
• Akyurt WPP (12.8 MW)
• Konakpınar WPP (12 MW)
• Ziyarettepe WPP (10 MW)
• Karaçayır WPP (10 MW)
• Gökböğet HEPP (3.176 MW)
• Söylemez HEPP (54.50 MW)
• Alakır-1 HEPP (8.33 MW)
• Alakır -2 HEPP (5.3 MW)

(*) It was established with 50% partnership of Demirer Energy.