About Us

Ado Enerji develops and invests in energy projects based on renewable energy sources. Our portfolio includes power plants in operation that generates hydraulic, wind and solar energy-based electricity We have projects that are in construction, licensing and application stages as well.

Our first commissioned project was the İNTEPE WPP project which we conducted in partnership with Demirer Group, the long-established local investor in wind energy sector, in 2007 with 30.4 MW installed capacity. Later, we increased this project’s capacity to 55.7 MW and in March 2016, an additional capacity was put into commission. İNTEPE WPP is the first WPP Project that received “GOLD STANDARD CERTIFICATION” in our country and the world.

In July 2016, we completed and commissioned our investments of AKYURT WPP, in the central district of Tokat with 14.7 MWm installed capacity, KONAKPINAR WPP, in Gürün district of Sivas with 14.7 MWm, and KARAÇAYIR WPP, in the central district of Sivas with 12.6 MWm installed capacity. We officially applied for the additional capacity increase of 46 MWm and we expect the investment for additional capacity increase to be completed at the end of 2018.





As the Energy Group, we also have power plants in the field of HEPP and also ongoing projects. In 2008 Alakır Dam and TOCAK-1 HEPP, in 2009 ALAKIR HEPP, and in 2011 KOZDERE HEPP projects were commissioned in the province of Antalya’s Kumluca District, Alakır Basin. ALAKIR-1 HEPP and ALAKIR-2 HEPP are among our ongoing projects in the province of Antalya’s Kumluca District.

In Tokat’s provincial borders, Omala Dam and the HEPP group are both still under construction. Our project’s tunnel and transmission channels are about to be completed. The construction of the dam block was initiated at the end of 2016, and we plan to commission TOKMAKKAYA HEPP, Karakaya HEPP and Omala HEPP projects in April 2018.


In the field of SPP, ADO and YURTÇİM Solar Power Plants were realized as twin solar energy projects. The installation phase of the power plants was completed on 1 July 2016 and they were commissioned on 2 August 2016 after the completion of legal procedures for provisional acceptance. The installed capacity of each plant is 1.1 MW. Our company aims to improve its projects by increasing the installed capacity of the Solar Power after the investments of ADO SPP and YURTÇİM SPP, which were initially commissioned as sample projects.