| Number of Turbines | 7 |
| Turbine Type Model | Gamesa G114 – 2.1 MW |
| Installed Capacity | 14,7 MWm / 12 MWe |
| Location | Böğrüdelik Köyü Mevkii , Gürün / SİVAS |
| License No/Date | EÜ/3424-5/2071 19.09.2011 |
| Capacity Factor | % 42 |
| Estimated Annual Generation | 45.000.000 kWh |
| Akyurt WPP Date of Provisional Acceptance 1 (T4-T5-T6-T7) | 29.09.2016 |
| Akyurt WPP Date of Provisional Acceptance 2 (T1-T2-T3) | 04.11.2016 |